What’s the minimum concrete cover for the ground-floor slab reinforcement?
Searching your documents…
Source Project Specification v5 · §4.2.3 Reinforcement & Cover
“Minimum cover to reinforcement for suspended slabs shall be 30 mm (exposure classification A2), increasing to 40 mm for elements cast against or in contact with the ground.”
Source AS 3600:2018 · Table 4.10.3.2 Standard formwork & compaction
“Exposure classification A2 — required cover to reinforcement: 30 mm.”
Grounding confidence
0%
⚠️ Spec and standard agree at 30 mm — but confirm the exposure classification for any slab-on-ground sections with the project engineer before the pour.
Was this helpful?
How much annual leave do our site labourers get?
Searching your documents…
⚠️
Gap logged so the document owner can decide whether to index it.