RFI Queue
Broadmeadows Civic Precinct — Stage 2 · 18 open · 1 urgent
RFI-044
Tania Vasquez
Costa Painting
Confirm feature wall colour — Level 1 foyer
→ Architect
RFI-045
Dev Patel
Apex Door Systems
Hardware set clarification — doors D-12 to D-18
→ Architect
RFI-046
Marco Ricci
Flowline Plumbing
Fire collar spec for 100mm PVC riser
→ Hydraulic consultant
RFI-047
Liam Brennan
Brennan Concreting
Penetration vs beam reo clash, Grid C/4 — pour Thu
→ Structural engineer
Drafted Reply
🔗 Grounded in: S-211 Rev C · H-204 · RFI register
Affects structural reinforcement (S-211 Rev C) — escalated to structural engineer. No technical direction issued without sign-off.
First response: 0 min
(was ~2 days in arrival order)