📝 RFI Queue
Broadmeadows Civic Precinct — Stage 2 · 18 open · 1 urgent
RFI-044
Tania Vasquez
Costa Painting
Confirm feature wall colour — Level 1 foyer
Low Finishes yesterday
Architect
RFI-045
Dev Patel
Apex Door Systems
Hardware set clarification — doors D-12 to D-18
Med Hardware schedule 6 hrs ago
Architect
RFI-046
Marco Ricci
Flowline Plumbing
Fire collar spec for 100mm PVC riser
Med Services / compliance 3 hrs ago
Hydraulic consultant
RFI-047
Liam Brennan
Brennan Concreting
Penetration vs beam reo clash, Grid C/4 — pour Thu
Urgent Design clash 20 min ago
Structural engineer
🔍 Message & Classification
From: Liam Brennan <site@brennanconcreting.com.au>
RFI-047 — Penetration vs beam reo clash, Grid C/4
Morning, Hit a clash setting out the Level 2 slab. The 450mm hydraulic penetration shown on H-204 at Grid C/4 lands right over the main beam bottom reinforcement on S-211 Rev C. We can't proceed with the pour booked for Thursday. Need direction on whether to relocate the penetration or adjust the reo. Crew is holding on site. Liam
Referenced drawings
📐 H-204 📐 S-211 Rev C 📅 Pour schedule
🧮 AI classification
Type Design clash — structural ✉ message
Urgency High — pour booked Thu, crew holding ✉ message
Route Structural Engineer · Renshaw Consulting 📝 routing map
Refs S-211 Rev C, H-204 (Grid C/4) 📐 RFI register
Reasoning Touches main beam reinforcement — requires engineer sign-off; not answerable from approved info. 📝 policy
0%
Classification confidence
✏️ Drafted Reply
🔗 Grounded in: S-211 Rev C · H-204 · RFI register
⚠️ Affects structural reinforcement (S-211 Rev C) — escalated to structural engineer. No technical direction issued without sign-off.
First response: 0 min (was ~2 days in arrival order)