RFI Triage Desk
Reads each incoming RFI, finds the relevant spec and drawing, drafts a first-pass answer with source links, flags duplicates and overdue items, and routes it to the right person — who reviews and approves before anything goes back.
The live demo, running on fabricated data. Open it to step through the full flow — every output is shown for a person to approve before anything happens.
Reads each incoming RFI, retrieves the spec clause and drawing sheet it points to, classifies and routes it, drafts a grounded holding reply, and lays it all out for the site admin or engineer to approve before anything goes back to site.
It gets a grounded first response onto every RFI within minutes, in arrival order or not.
- Done by hand each RFI is a 15-to-30-minute read-and-route before any answer is drafted, and the urgent design clash can sit behind ten low-priority finishes queries.
- Best where RFI volume is high and routing is habit, not rule: a contract administrator or site engineer fielding dozens a week across multiple subcontractors.
- At twenty or fifty RFIs a week, the recaptured hours go back into resolving the hard ones with the consultant, not sorting the inbox.
It is confidently wrong when it answers from a superseded drawing — and a clean citation makes the wrong answer look right.
- Weak on genuine design clashes and anything touching structure, fire or services compliance — it should escalate to the engineer of record, never draft a technical direction.
- If your drawing control is loose — multiple revisions live at once, no single current set — the draft is only as trustworthy as the sheet it happened to retrieve.
If you cannot say, right now, that the register it reads holds only the current revision of every sheet, this tool makes your wrong answer faster to send, not safer.
It drafts and routes. A person approves. On anything structural it escalates and stops.
An RFI response is a permanent project record: it can authorise a variation, shift a deadline, and feed a payment claim under Victoria's Building and Construction Industry Security of Payment Act 2002. Structural and code-compliance design intent belongs to the engineer of record — in Victoria structural documentation must be certified and signed by a registered building practitioner of the relevant class. The accountable person stays on the decision because the consequence — on cost, on programme, on safety — lands on them, not the tool.
A current drawing register, the project specification, and a routing map of who owns what.
Drawing control is usually the weak point — superseded revisions left live alongside the current set, and a routing map that exists only as tribal knowledge. Getting to one controlled, current register and an explicit routing map is usually the real first job — larger and more valuable than the drafting layer on top. Once the inputs are clean, every RFI after that is triaged right by default.
The worried-buyer questions, answered straight
Fixed scope, fixed price, fixed dates.
Considering this for your project?
The honest place to start is a bite-sized first piece — one contained change, low risk. Tell us where the RFI backlog hurts; we'll play it back, scope it, and show you what's possible.